22 May, 2016 give the following elements separately:
Cu,As,Cd,Hg,F,Zn,Pb,Fe,Radioactivity, Moisture
Load port:
Delivery (the first deal and schedule):
Procedure:
1. Contract to be signed by both of the seller and buyer
2. Payment instrument (DLC/RDLC/SBLC/BG)
3. PB to be issued from seller’s bank
4. SGS inspection at the unload port
5. Payment against the SGS report and the relative documents
Yang
Related Keywords : COPPER ORE/CONCENTRATE, LEAD ORE, ZINC ORECategories : Minerals & Metallurgy, Copper Ore