Search Advanced Search

We Buy Tube Bundle

  • Date Posted :

    2018-09-04

  • Valid Until :

    2019-09-04

Contact Now Send an Inquiry to this buyer.
Facebook Twitter Delicious LinkedIn Favorite Add to My EC21 Email this page

Sign in to view this member's contact information

Forgot Password?

This buyer has chosen to show contact information to all members.
You may sign in to view contact details and send an inquiry.

Dear Sir,

You are kindly requested to submit your best quotation and delivery time for Tube Bundle for the following heat exchanger:

- 41-30-HA-004
- 42-30-HA-004
- 41-30-HA-003
- 42-30-HA-003
- 51-30-HA-003
- 52-30-HA-003


Tube Internally coated (CW SIDE)
Stationary and floating tube sheet-coated (CW SIDE)

Two options of coating specification as following:

- 1st option :GMA srl Blasting to SA 2.5/ 3 and applying Phencote system on the entire inner tubes and tube sheet.

- 2nd Option: SAKAPHEN GmbH Blasting to SA2.5 ? 3 and applying Sakaphen coating system on the entire inner tubes and tube sheet.


Note: The executing companies will select the appropriate coating system either cold or hot cured and dry film thikcness on each heat exchanger according to many factors i.e. temperature, PH range, fluid velocity, abrasion, ?etc.

General Notes : for tube bundle

1. TUBE BUNDLE SHALL BE ASME SEC VIII DIV.1 WITH U-STAMP ANDTEMA CLASS R. LATEST EDITION OF STANDARDS AND CODES SHALL BE USED.

2. ALL MATERIAL SPECIFICATION & DIMENSIONS SHALL BE AS PER OUR COMPANY DRAWING ONLY. IF THERE IS ANY DEVIATION FROM THE ORIGINAUDRAWINGS,THE SAME SHALL BE NOTIFIED TO US AND GET APPROVAL FROM MOG ENGINEERING DEPARTMENT.

3. THIRD PARTY INSPECTION AGENCY SHALL BE APPROVED BY MOG.

4. COATING SPECIFICATION SHALL BE REVIEWED AND APPROVED BY MOG.

5. THE BELOW LISTED DOCUMENTS SHALL BE SUBMITTED TO MOG FOR REVIEW AND APPROVAL AT THE RESPECTIVE STAGES.

a. valid ASME CERTIFICATE OF AUTHORIZATION

b. SUPPLIERS QUALITY MANUAL AND QUALITY ORGANIZATION CHART DESCRIBING QUALITY MANAGEMENT SYSTEM ADOPTED BY THE SUPPLIER

6. MOG representatives-2 persons shall attend hydro test at fabrication site as a witness.


We need your quotation no later than 08 September 2018.


We will highly appreciate your quick action.

Best Regards
Ons Hmani
Mechanical Engineer

Related Keywords : Tube Bundle

If you can't find more Buying Leads related to your items, why not post your Selling Leads and Products instead?

It will let your potential buyers to contact you directly.

Browse: Manufacturer Directory Countries China India Korea Premium Suppliers Community Site Map

About EC21 Contact Us Terms & Conditions Report Item Online Trading Risks Product Listing Policy

中文 繁體 한국어 日本語 Español Русский Français Deutsch

Copyright (c)1997-2019 EC21 Inc. All Rights Reserved. EC21 in KoreanChinese

Business Registry Number: 120-86-03931

Inquiry Basket ()